Posted on 17 April 2024 By Michael Wood
Whether you are an architect, contractor or organisation, Changing Places installations can be tricky.
Limited staff capacity to oversee a project or changes to designs and budgets all have an impact that can cause major delays and rising costs.
However, with an approved supplier like Innova, we aim to minimise those risks and making it simpler by delivering solutions that help turbocharge your project delivery.
Scroll down to discover some of the ways we can support you to ensure you meet your Changing Places project deadlines.
One of the major obstacles that many local authorities, businesses and organisations have to overcome when installing a Changing Places is a lack of space and planning permission.
With traditional construction methods, there can be on-site challenges, whether that is waiting for materials to arrive to putting procedures in place to reduce disruption for members of the public in high-traffic areas.
Each of those factors can cause significant delays, hampering the chances of a project meeting tight deadlines.
That’s why Innova specialise in a modular approach to Changing Places installations.
Since the modules are fabricated simultaneously off-site while site preparation occurs, the overall timeline is significantly reduce. Additionally, the reduced on-site construction results in less noise, dust, and debris, minimising inconvenience for individuals visiting or working at a venue during the installation process.
Opting for a modular facility can make a huge difference in saving time to install a Changing Places toilet. However, to make this process even quicker and more streamlined, we can manufacture modular Changing Places up front!
This unique offering provides a fantastic advantage in terms of deployment speed. Instead of going through the time-consuming processes involved in design, approvals, and on-site construction, local authorities can select modular Changing Places from stock.
Not only does this allow you to save time on design and construction, it also enables you to respond promptly to challenging deadlines.
Confirming a date to receive delivery of a facility or begin installation work can be a major headache for any venue. It is part of the delivery process that is often subject to delays, with councils, businesses and organisations having to contend with varying demands across different locations.
With our in-house storage facilities, Innova are perfectly placed to help take the hassle out of that process. By providing a highly-efficient logistics and delivery service, we can ensure you can access your Changing Places toilets promptly, avoiding delays and minimising disruptions to their accessibility projects.
Whether you need a Changing Places delivered immediately or prefer to schedule deliveries based on your specific timelines, Innova’s flexible approach caters to your requirements. Through advanced inventory tracking systems and efficient stock management practices, Innova can support your procurement and project management teams so they can easily monitor and access Changing Places toilet inventory.
Instead of investing in dedicated storage spaces or facilities, you can leverage Innova’s infrastructure on an as-needed basis. This eliminates the need for long-term storage contracts or the burden of maintaining storage spaces.
Whether you have a project to install a Changing Places within an existing building or require a modular facility, we have cost-effective solutions in place to help save you time and reduce any unnecessary delays.
To help minimise risk, get the support and guidance you need from Innova.